Byron Shire Council — Development Application Data

A live snapshot of development activity in Byron Shire Council — sourced from NSW Government open data and the Plan Advice precedent library of 129,723 council determinations. Refreshed automatically. Data reflects the most recent NSW Planning Portal open-data feeds, counted application by application.

DAs on file
5,999
Since 2021
Lodged last 12m
648
Median assessment
87 days
Clause 4.6 rate
4.4%
Development standard variations

Determination outcomes

Real approval, refusal and withdrawal rates from finalised DAs in the Plan Advice enriched corpus.

Approved
81.8%
of 4,765 determined DAs
Refused
3.3%
Withdrawn
14.9%

Based on the 72.4% of DAs in our Byron Shire Council corpus with a confirmed determination. Applications still under assessment, and any whose outcome the council has not published, are excluded rather than estimated.

How long a DA takes in Byron Shire Council, and who decides it

Counted from every application Byron Shire Council determined in the last 5 years, as published in the NSW Planning Portal open data. Timelines are lodgement to determination, so they include the time spent waiting on the applicant.

Median determination
87 days
across 3,268 determinations
Slowest 20% take
184+ days
the figure worth planning around
Against NSW
+27 days
the NSW median is 60 days
Approved as CDC
24.1%
1,019 complying development certificates
Who determines applications here
Council (delegation not specified)62.4% · 2,074
Council staff under delegation35.4% · 1,175

An application determined under delegation is decided by the assessing officer. Anything referred to a panel or the elected body is decided in a public meeting and adds a meeting cycle to the timeline. Where the council recorded only “Council” it did not say which, so that row is left as published.

4.7% of applications in Byron Shire Council sought a clause 4.6 variation to a development standard, and 3.3% of those variations were granted (5 of 151). 4.1% of DAs lodged were withdrawn before a determination was made. On the CDC side, 31.5% of certificates lodged were rejected rather than accepted, at an average declared cost of $1,071,015.

Why DAs get refused in Byron Shire Council

Grounds cited across 104 refused applications, read from the council's own notices of determination. Most recent determination indexed: July 2026. Most refusals cite several grounds at once, so these overlap.

Contrary to the public interest (s4.15(1)(e))84 refusals
83 of these treated it as a decisive ground
Site not suitable for the development (s4.15(1)(c))69 refusals
69 of these treated it as a decisive ground
Insufficient information submitted by applicant44 refusals
38 of these treated it as a decisive ground
Parking shortfall, traffic or vehicular access34 refusals
27 of these treated it as a decisive ground
Stormwater, drainage or flooding30 refusals
29 of these treated it as a decisive ground
Land use prohibited / not permissible in zone28 refusals
28 of these treated it as a decisive ground
Other ground not covered above25 refusals
21 of these treated it as a decisive ground
Streetscape / neighbourhood character incompatibility24 refusals
19 of these treated it as a decisive ground
Read the council's exact wording

Behind each ground above sits the verbatim paragraph the assessing officer wrote, the LEP and DCP clauses it was tested against, and the address and DA number so you can pull the notice yourself. 613 grounds across Byron Shire Council are indexed this way.

See the grounds in full

Conditions you should expect

Approval is not the finish line — every consent arrives with conditions. This is what Byron Shire Council actually imposes, measured from the consent notices it has published.

Conditions marked costs money are the ones to budget for — contributions, bonds, specialist reports and public-domain works.

97%Appoint a principal certifier
94%Construction certificate before works start
90%Section 68 Local Government Act approvalCOSTS MONEY
88%Security bond or damage depositCOSTS MONEY
88%Erosion and sediment control
78%Heritage controlsCOSTS MONEY
71%BASIX commitments
70%Long service levyCOSTS MONEY
67%Build in accordance with the approved plans
64%Asbestos / hazardous materials handling
61%Acoustic / noise limitsCOSTS MONEY
59%Waste management plan

Based on 2,253 approvals with a published notice of determination · 5 of the conditions above carry a cost. A condition on most approvals is effectively standard; it is not a guarantee of what any individual consent will say.

Development type mix

What people are building in Byron Shire Council. Ranked by DA volume.

Erection of a new structure1,053
Alterations and additions to residential development984
Alterations or additions to an existing building or structure970
Dwelling house931
Pools / decks / fencing905
Dwelling638
Secondary dwelling533
Other510

Development cost distribution

Estimated development cost ranges reported on Byron Shire Council DAs.

Under $100k2,666
$100k – $500k1,730
$500k – $1M693
$1M – $5M650
$5M+134

Byron Shire Council DAs — common questions

Answered from this council's own determinations. Where a council has not published a figure, the question is left out rather than guessed.

How many development applications does Byron Shire Council handle?

Plan Advice holds 5,999 development applications for Byron Shire Council, 648 of them lodged in the last 12 months. The figures on this page are counted from that register, not estimated.

How long does a DA take in Byron Shire Council?

The median assessment time is 87 days. That is the council's own reported figure from the NSW Planning Portal league tables, so it covers every DA they determined — not a sample.

How long does the council take to determine a DA in Byron Shire Council?

The median is 87 days from lodgement to determination across 3,268 applications determined in the last 5 years, and the slowest fifth take 184 days or more. The NSW median is 60 days. Counted from the NSW Planning Portal open data, so it covers every application — not a sample.

Who decides development applications in Byron Shire Council?

35.4% of determinations were made by council staff under delegated authority. council (delegation not specified) determined 62.4%. Anything referred to a panel or the elected body is decided in a public meeting, which adds a meeting cycle.

Does Byron Shire Council approve clause 4.6 variations?

4.7% of applications sought a variation to a development standard, and 3.3% of those were granted (5 of 151 in the last 5 years).

Can I use a CDC instead of a DA in Byron Shire Council?

24.1% of approvals in this LGA went through as complying development (1,019 certificates in the last 5 years), and 31.5% of CDC applications lodged were rejected rather than accepted. A CDC only applies if the proposal meets every development standard in the Codes SEPP.

What share of DAs does Byron Shire Council approve?

81.8% of the 4,765 determined applications we hold were approved and 3.3% were refused. We can read a determination for 72.4% of this council's DAs; the rest are counted as unknown rather than assumed approved.

Why are DAs refused in Byron Shire Council?

Across 104 refused applications, the grounds cited most often are contrary to the public interest (s4.15(1)(e)) (84 refusals), insufficient information submitted by applicant (44 refusals), site not suitable for the development (s4.15(1)(c)) (69 refusals). These are read from the council's own notices of determination, and most refusals cite several grounds at once.

What kinds of development are most common in Byron Shire Council?

The most frequent application types are erection of a new structure (1,053), alterations and additions to residential development (984), alterations or additions to an existing building or structure (970).

How often is a clause 4.6 variation used in Byron Shire Council?

265 applications — 4.42% of the register — sought a clause 4.6 variation to a development standard.

Most recent development applications

Sampled from the NSW Planning Portal open-data feed.

10.2007.52.4
15 MCGETTIGANS LANE EWINGSDALE 2481
Restaurant or cafe · lodged 2026-09-02
$5,500
PAN-690860
41 FEDERAL DRIVE EUREKA 2480
Dual occupancy · lodged 2026-11-07
$41,339
PAN-686695
67 PICADILLY HILL ROAD COOPERS SHOOT 2479
Secondary dwelling · lodged 2026-11-07
$1,000,000
PAN-690590
963 MAIN ARM ROAD MAIN ARM 2482
Dwelling house · lodged 2026-11-06
$528,000
PAN-690495
109-111 BROKEN HEAD ROAD SUFFOLK PARK 2481
Demolition · lodged 2026-11-06
Assessing a property in Byron Shire Council?

Get a free, instant AI-powered analysis of your property's zoning, planning controls and likely DA outcome — grounded in Plan Advice's 129,723-determination NSW precedent library.

Start free assessment →
Nearby councils: cabonne · camden · campbelltown · canterbury bankstown · carrathool · central coast · central darling · cessnock · canada bay · parramatta · clarence valley · cobar — or see DA statistics for all 129 NSW councils.