Plan Advice
← Back to Plan Advice

Waverley Council — Development Application Data

Waverley Council processes one of the highest volumes of development applications in metropolitan Sydney, with 1715 lodged in the past year and 4735 on file since 2021, yet maintains a median assessment time of 87 days. One in five applications invokes Clause 4.6 to vary a development standard, reflecting the pressure to maximise yield in a built-up coastal area where site constraints are common. Alterations and additions account for 1206 applications, while 313 target residential flat buildings—a reminder of the Eastern Suburbs apartment renewal pipeline. When council refuses development, the most frequent grounds are that proposals are contrary to the public interest under s4.15(1)(e), cited in 97 refusals, followed by site unsuitability in 80 cases and streetscape or neighbourhood character concerns in 75. Refusals tied to building height, scale, bulk or massing appear in 59 decisions, underscoring the importance of contextual fit in Bondi, Bronte and surrounding precincts. A Plan Advice AI assessment for your Waverley property runs in seconds.

DAs on file
4,832
Since 2021
Lodged last 12m
1,762
Median assessment
87 days
FY FY25-26
Clause 4.6 rate
20.3%
Development standard variations

Determination outcomes

Real approval, refusal and withdrawal rates from finalised DAs in the Plan Advice enriched corpus.

Approved
94.6%
of 2,883 determined DAs
Refused
5.4%
Withdrawn
0%

Based on the 100% of DAs in our Waverley Council corpus with a confirmed determination. Applications still under assessment, and any whose outcome the council has not published, are excluded rather than estimated.

How long a DA takes in Waverley Council, and who decides it

Counted from every application Waverley Council determined in the last 5 years, as published in the NSW Planning Portal open data. Timelines are lodgement to determination, so they include the time spent waiting on the applicant.

Median determination
83 days
across 3,291 determinations
Slowest 20% take
152+ days
the figure worth planning around
Against NSW
+23 days
the NSW median is 60 days
Approved as CDC
35.3%
1,937 complying development certificates
Who determines applications here
Council (delegation not specified)65.3% · 2,187
Council staff under delegation15.6% · 524
Local Planning Panel14.3% · 480
Land and Environment Court1.9% · 64

An application determined under delegation is decided by the assessing officer. Anything referred to a panel or the elected body is decided in a public meeting and adds a meeting cycle to the timeline. Where the council recorded only “Council” it did not say which, so that row is left as published.

20.8% of applications in Waverley Council sought a clause 4.6 variation to a development standard, and 50.3% of those variations were granted (371 of 737). 6.4% of DAs lodged were withdrawn before a determination was made. On the CDC side, 17.4% of certificates lodged were rejected rather than accepted, at an average declared cost of $505,470.

Why DAs get refused in Waverley Council

Grounds cited across 119 refused applications, read from the council's own notices of determination. Most recent determination indexed: July 2026. Most refusals cite several grounds at once, so these overlap.

Contrary to the public interest (s4.15(1)(e))97 refusals
82 of these treated it as a decisive ground
Site not suitable for the development (s4.15(1)(c))80 refusals
80 of these treated it as a decisive ground
Streetscape / neighbourhood character incompatibility75 refusals
61 of these treated it as a decisive ground
Insufficient information submitted by applicant65 refusals
50 of these treated it as a decisive ground
Building height, scale, bulk or massing59 refusals
56 of these treated it as a decisive ground
Parking shortfall, traffic or vehicular access44 refusals
30 of these treated it as a decisive ground
Landscaping deficiency or tree removal44 refusals
13 of these treated it as a decisive ground
Overshadowing / solar access loss to neighbours43 refusals
36 of these treated it as a decisive ground
Read the council's exact wording

Behind each ground above sits the verbatim paragraph the assessing officer wrote, the LEP and DCP clauses it was tested against, and the address and DA number so you can pull the notice yourself. 903 grounds across Waverley Council are indexed this way.

See the grounds in full

Conditions you should expect

Approval is not the finish line — every consent arrives with conditions. This is what Waverley Council actually imposes, measured from the consent notices it has published.

Conditions marked costs money are the ones to budget for — contributions, bonds, specialist reports and public-domain works.

99%Construction certificate before works start
94%Appoint a principal certifier
89%Section 7.12 levyCOSTS MONEY
89%Section 7.11 developer contributionsCOSTS MONEY
89%Restricted construction hours
88%Security bond or damage depositCOSTS MONEY
86%Long service levyCOSTS MONEY
83%Asbestos / hazardous materials handling
78%Erosion and sediment control
78%Sydney Water approval (Section 73)COSTS MONEY
75%BASIX commitments
73%Stormwater / on-site detentionCOSTS MONEY

Based on 753 approvals with a published notice of determination · 6 of the conditions above carry a cost. A condition on most approvals is effectively standard; it is not a guarantee of what any individual consent will say.

Development type mix

What people are building in Waverley Council. Ranked by DA volume.

Other2,888
Alterations & additions1,220
Residential flat building322
Dual occupancy176
Subdivision77
Commercial48
Change of use38

Development cost distribution

Estimated development cost ranges reported on Waverley Council DAs.

Under $100k1,703
$100k – $500k1,446
$500k – $1M438
$1M – $5M976
$5M+198

Waverley Council DAs — common questions

Answered from this council's own determinations. Where a council has not published a figure, the question is left out rather than guessed.

How many development applications does Waverley Council handle?

Plan Advice holds 4,832 development applications for Waverley Council, 1,762 of them lodged in the last 12 months. The figures on this page are counted from that register, not estimated.

How long does a DA take in Waverley Council?

The median assessment time is 87 days for FY25-26, after a median 15 days to get the application accepted for lodgement. That is the council's own reported figure from the NSW Planning Portal league tables, so it covers every DA they determined — not a sample.

How long does the council take to determine a DA in Waverley Council?

The median is 83 days from lodgement to determination across 3,291 applications determined in the last 5 years, and the slowest fifth take 152 days or more. The NSW median is 60 days. Counted from the NSW Planning Portal open data, so it covers every application — not a sample.

Who decides development applications in Waverley Council?

15.6% of determinations were made by council staff under delegated authority. council (delegation not specified) determined 65.3%, local planning panel determined 14.3%, land and environment court determined 1.9%. Anything referred to a panel or the elected body is decided in a public meeting, which adds a meeting cycle.

Does Waverley Council approve clause 4.6 variations?

20.8% of applications sought a variation to a development standard, and 50.3% of those were granted (371 of 737 in the last 5 years).

Can I use a CDC instead of a DA in Waverley Council?

35.3% of approvals in this LGA went through as complying development (1,937 certificates in the last 5 years), and 17.4% of CDC applications lodged were rejected rather than accepted. A CDC only applies if the proposal meets every development standard in the Codes SEPP.

What share of DAs does Waverley Council approve?

94.6% of the 2,883 determined applications we hold were approved and 5.4% were refused. We can read a determination for 100% of this council's DAs; the rest are counted as unknown rather than assumed approved.

Why are DAs refused in Waverley Council?

Across 119 refused applications, the grounds cited most often are contrary to the public interest (s4.15(1)(e)) (97 refusals), streetscape / neighbourhood character incompatibility (75 refusals), building height, scale, bulk or massing (59 refusals). These are read from the council's own notices of determination, and most refusals cite several grounds at once.

What kinds of development are most common in Waverley Council?

The most frequent application types are alterations & additions (1,220), residential flat building (322), dual occupancy (176).

How often is a clause 4.6 variation used in Waverley Council?

982 applications — 20.32% of the register — sought a clause 4.6 variation to a development standard.

Most recent development applications

Sampled from the NSW Planning Portal open-data feed.

PAN-674663
328 BRONTE ROAD WAVERLEY 2024
Other · lodged 2026-09-11T20:42:47.500
PAN-674492
1 PRINCESS STREET ROSE BAY 2029
Other · lodged 2026-09-11T20:40:24.690
$48,000
PAN-674489
17 BEACH ROAD BONDI BEACH 2026
Other · lodged 2026-09-11T20:40:22.150
$95,717
PAN-674440
1 23 BLAIR STREET BONDI BEACH 2026
Residential flat building · lodged 2026-09-11T20:39:38.290
$10,000
PAN-674296
21 KENT STREET WAVERLEY 2024
Other · lodged 2026-09-11T20:37:09.710
$3,610,876
Assessing a property in Waverley Council?

Get a free, instant AI-powered analysis of your property's zoning, planning controls and likely DA outcome — grounded in Plan Advice's 413,770-DA NSW corpus.

Start free assessment →
Nearby councils: weddin · wentworth · willoughby · wingecarribee · wollondilly · wollongong · woollahra · yass valley · albury · armidale · ballina · balranald — or see DA statistics for all 129 NSW councils.