Penrith City Council — Development Application Data
With 2345 development applications lodged in the past year and 6415 on file since 2021, Penrith City Council manages one of the highest DA volumes in Western Sydney. The median assessment time sits at 97 days, giving you a realistic timeline for planning your project. What stands out is the low Clause 4.6 variation usage rate of just 2.17%, suggesting most applications here proceed without needing to vary development standards like height or floor space ratio. The DA landscape is dominated by "Other" category developments at 4047 applications, followed by alterations and additions at 747, and dual occupancies at 568. Cost-wise, the data shows strong activity across all bands, from 2774 applications under $100k to 338 major projects exceeding $5M. If you're considering a development in Penrith, a Plan Advice AI-powered assessment for your property takes seconds to run.
Determination outcomes
Real approval, refusal and withdrawal rates from finalised DAs in the Plan Advice enriched corpus.
Based on the 72.2% of DAs in our Penrith City Council corpus with a confirmed determination. Applications still under assessment, and any whose outcome the council has not published, are excluded rather than estimated.
How long a DA takes in Penrith City Council, and who decides it
Counted from every application Penrith City Council determined in the last 5 years, as published in the NSW Planning Portal open data. Timelines are lodgement to determination, so they include the time spent waiting on the applicant.
An application determined under delegation is decided by the assessing officer. Anything referred to a panel or the elected body is decided in a public meeting and adds a meeting cycle to the timeline. Where the council recorded only “Council” it did not say which, so that row is left as published.
2.3% of applications in Penrith City Council sought a clause 4.6 variation to a development standard, and 56.5% of those variations were granted (52 of 92). 12.1% of DAs lodged were withdrawn before a determination was made. On the CDC side, 13.3% of certificates lodged were rejected rather than accepted, at an average declared cost of $699,386.
Why DAs get refused in Penrith City Council
Grounds cited across 118 refused applications, read from the council's own notices of determination. Most recent determination indexed: September 2026. Most refusals cite several grounds at once, so these overlap.
Behind each ground above sits the verbatim paragraph the assessing officer wrote, the LEP and DCP clauses it was tested against, and the address and DA number so you can pull the notice yourself. 1,048 grounds across Penrith City Council are indexed this way.
See the grounds in fullConditions you should expect
Approval is not the finish line — every consent arrives with conditions. This is what Penrith City Council actually imposes, measured from the consent notices it has published.
Conditions marked costs money are the ones to budget for — contributions, bonds, specialist reports and public-domain works.
| 94% | Appoint a principal certifier | |
| 90% | Construction certificate before works start | |
| 73% | Waste management plan | |
| 73% | Stormwater / on-site detentionCOSTS MONEY | |
| 72% | Sydney Water approval (Section 73)COSTS MONEY | |
| 68% | Erosion and sediment control | |
| 64% | Asbestos / hazardous materials handling | |
| 53% | Survey certificate at set-outCOSTS MONEY | |
| 51% | BASIX commitments | |
| 50% | Landscaping to be implemented and maintainedCOSTS MONEY | |
| 45% | Vehicular crossing, footpath and kerb worksCOSTS MONEY | |
| 28% | Construction management plan |
Based on 1,208 approvals with a published notice of determination · 5 of the conditions above carry a cost. A condition on most approvals is effectively standard; it is not a guarantee of what any individual consent will say.
Development type mix
What people are building in Penrith City Council. Ranked by DA volume.
Development cost distribution
Estimated development cost ranges reported on Penrith City Council DAs.
Penrith City Council DAs — common questions
Answered from this council's own determinations. Where a council has not published a figure, the question is left out rather than guessed.
How many development applications does Penrith City Council handle?
Plan Advice holds 6,522 development applications for Penrith City Council, 2,282 of them lodged in the last 12 months. The figures on this page are counted from that register, not estimated.
How long does a DA take in Penrith City Council?
The median assessment time is 97 days for FY25-26, after a median 9 days to get the application accepted for lodgement. That is the council's own reported figure from the NSW Planning Portal league tables, so it covers every DA they determined — not a sample.
How long does the council take to determine a DA in Penrith City Council?
The median is 61 days from lodgement to determination across 3,540 applications determined in the last 5 years, and the slowest fifth take 162 days or more. The NSW median is 60 days. Counted from the NSW Planning Portal open data, so it covers every application — not a sample.
Who decides development applications in Penrith City Council?
28.8% of determinations were made by council staff under delegated authority. council (delegation not specified) determined 65.4%, local planning panel determined 3%, regional or sydney planning panel determined 1%. Anything referred to a panel or the elected body is decided in a public meeting, which adds a meeting cycle.
Does Penrith City Council approve clause 4.6 variations?
2.3% of applications sought a variation to a development standard, and 56.5% of those were granted (52 of 92 in the last 5 years).
Can I use a CDC instead of a DA in Penrith City Council?
63.3% of approvals in this LGA went through as complying development (6,955 certificates in the last 5 years), and 13.3% of CDC applications lodged were rejected rather than accepted. A CDC only applies if the proposal meets every development standard in the Codes SEPP.
What share of DAs does Penrith City Council approve?
70.9% of the 2,213 determined applications we hold were approved and 7% were refused. We can read a determination for 72.2% of this council's DAs; the rest are counted as unknown rather than assumed approved.
Why are DAs refused in Penrith City Council?
Across 118 refused applications, the grounds cited most often are contrary to the public interest (s4.15(1)(e)) (111 refusals), site not suitable for the development (s4.15(1)(c)) (108 refusals), streetscape / neighbourhood character incompatibility (73 refusals). These are read from the council's own notices of determination, and most refusals cite several grounds at once.
What kinds of development are most common in Penrith City Council?
The most frequent application types are alterations & additions (756), dual occupancy (573), subdivision (383).
How often is a clause 4.6 variation used in Penrith City Council?
142 applications — 2.18% of the register — sought a clause 4.6 variation to a development standard.
Most recent development applications
Sampled from the NSW Planning Portal open-data feed.
Get a free, instant AI-powered analysis of your property's zoning, planning controls and likely DA outcome — grounded in Plan Advice's 129,723-determination NSW precedent library.
Start free assessment →