Strathfield Council — Development Application Data
Development activity in Strathfield Council runs heavily towards smaller alterations and renovations, with 1180 of 1546 applications since 2021 classified as Other development types, while 631 applications sat under $100k in value. The council processed 636 DAs in the last year with a median assessment time of 85 days, placing it in the mid-range compared to neighbouring Inner West councils. Only 7.44% of applications relied on Clause 4.6 variations to exceed development standards, suggesting most proposals conform to strict planning controls in this heritage-conscious municipality. The cost distribution reveals a mixed picture: while the majority are modest projects, 480 applications fell in the $1M to $5M band and 86 exceeded $5M, reflecting pockets of significant residential investment. Dual occupancies and residential flat buildings represent growing typologies with 58 and 46 applications respectively. A Plan Advice AI assessment for your Strathfield property takes seconds and delivers site-specific planning intelligence before you engage consultants.
Determination outcomes
Real approval, refusal and withdrawal rates from finalised DAs in the Plan Advice enriched corpus.
Based on the 99% of DAs in our Strathfield Council corpus with a confirmed determination. Applications still under assessment, and any whose outcome the council has not published, are excluded rather than estimated.
How long a DA takes in Strathfield Council, and who decides it
Counted from every application Strathfield Council determined in the last 5 years, as published in the NSW Planning Portal open data. Timelines are lodgement to determination, so they include the time spent waiting on the applicant.
An application determined under delegation is decided by the assessing officer. Anything referred to a panel or the elected body is decided in a public meeting and adds a meeting cycle to the timeline. Where the council recorded only “Council” it did not say which, so that row is left as published.
9.3% of applications in Strathfield Council sought a clause 4.6 variation to a development standard, and 22.2% of those variations were granted (20 of 90). 5% of DAs lodged were withdrawn before a determination was made. On the CDC side, 16.1% of certificates lodged were rejected rather than accepted, at an average declared cost of $461,696.
Development type mix
What people are building in Strathfield Council. Ranked by DA volume.
Development cost distribution
Estimated development cost ranges reported on Strathfield Council DAs.
Strathfield Council DAs — common questions
Answered from this council's own determinations. Where a council has not published a figure, the question is left out rather than guessed.
How many development applications does Strathfield Council handle?
Plan Advice holds 1,583 development applications for Strathfield Council, 626 of them lodged in the last 12 months. The figures on this page are counted from that register, not estimated.
How long does a DA take in Strathfield Council?
The median assessment time is 85 days for FY25-26, after a median 15 days to get the application accepted for lodgement. That is the council's own reported figure from the NSW Planning Portal league tables, so it covers every DA they determined — not a sample.
How long does the council take to determine a DA in Strathfield Council?
The median is 84 days from lodgement to determination across 961 applications determined in the last 5 years, and the slowest fifth take 152 days or more. The NSW median is 60 days. Counted from the NSW Planning Portal open data, so it covers every application — not a sample.
Who decides development applications in Strathfield Council?
21.4% of determinations were made by council staff under delegated authority. council (delegation not specified) determined 69.5%, local planning panel determined 6.5%. Anything referred to a panel or the elected body is decided in a public meeting, which adds a meeting cycle.
Does Strathfield Council approve clause 4.6 variations?
9.3% of applications sought a variation to a development standard, and 22.2% of those were granted (20 of 90 in the last 5 years).
Can I use a CDC instead of a DA in Strathfield Council?
53.3% of approvals in this LGA went through as complying development (1,105 certificates in the last 5 years), and 16.1% of CDC applications lodged were rejected rather than accepted. A CDC only applies if the proposal meets every development standard in the Codes SEPP.
What share of DAs does Strathfield Council approve?
85.8% of the 1,193 determined applications we hold were approved and 9.2% were refused. We can read a determination for 99% of this council's DAs; the rest are counted as unknown rather than assumed approved.
What kinds of development are most common in Strathfield Council?
The most frequent application types are alterations & additions (154), dual occupancy (59), residential flat building (47).
How often is a clause 4.6 variation used in Strathfield Council?
116 applications — 7.33% of the register — sought a clause 4.6 variation to a development standard.
Most recent development applications
Sampled from the NSW Planning Portal open-data feed.