Hunters Hill Council — Development Application Data
Development standard variations are unusually common in Hunters Hill Council, with 40.79% of the 1145 development applications lodged since 2021 seeking relief under Clause 4.6—well above typical Sydney metro rates. The council processed 370 DAs in the past year, with a median assessment time of 95 days. Applications span a wide cost spectrum: 421 came in under $100k, while 280 ranged from $1M to $5M and 17 exceeded $5M. While most applications are classified as Other (842), alterations and additions account for 227 DAs, followed by dual occupancy (34), residential flat buildings (14), and subdivisions (12). The prevalence of variation requests suggests Hunters Hill's planning controls frequently constrain proposals on heritage streetscapes and smaller lots, making site-specific merit arguments critical. A Plan Advice AI assessment for your Hunters Hill property delivers a detailed feasibility read in seconds.
Determination outcomes
Real approval, refusal and withdrawal rates from finalised DAs in the Plan Advice enriched corpus.
Based on the 67.6% of DAs in our Hunters Hill Council corpus with a confirmed determination. Applications still under assessment, and any whose outcome the council has not published, are excluded rather than estimated.
How long a DA takes in Hunters Hill Council, and who decides it
Counted from every application Hunters Hill Council determined in the last 5 years, as published in the NSW Planning Portal open data. Timelines are lodgement to determination, so they include the time spent waiting on the applicant.
An application determined under delegation is decided by the assessing officer. Anything referred to a panel or the elected body is decided in a public meeting and adds a meeting cycle to the timeline. Where the council recorded only “Council” it did not say which, so that row is left as published.
41.3% of applications in Hunters Hill Council sought a clause 4.6 variation to a development standard, and 96.5% of those variations were granted (327 of 339). 6.6% of DAs lodged were withdrawn before a determination was made. On the CDC side, 20.1% of certificates lodged were rejected rather than accepted, at an average declared cost of $434,325.
Why DAs get refused in Hunters Hill Council
Grounds cited across 92 refused applications, read from the council's own notices of determination. Most recent determination indexed: July 2026. Most refusals cite several grounds at once, so these overlap.
Behind each ground above sits the verbatim paragraph the assessing officer wrote, the LEP and DCP clauses it was tested against, and the address and DA number so you can pull the notice yourself. 479 grounds across Hunters Hill Council are indexed this way.
See the grounds in fullConditions you should expect
Approval is not the finish line — every consent arrives with conditions. This is what Hunters Hill Council actually imposes, measured from the consent notices it has published.
Conditions marked costs money are the ones to budget for — contributions, bonds, specialist reports and public-domain works.
| 100% | Appoint a principal certifier | |
| 92% | Construction certificate before works start | |
| 87% | Vehicular crossing, footpath and kerb worksCOSTS MONEY | |
| 85% | Waste management plan | |
| 76% | Erosion and sediment control | |
| 71% | Stormwater / on-site detentionCOSTS MONEY | |
| 65% | Asbestos / hazardous materials handling | |
| 65% | Sydney Water approval (Section 73)COSTS MONEY | |
| 64% | Tree protection and arborist supervisionCOSTS MONEY | |
| 62% | BASIX commitments | |
| 58% | Landscaping to be implemented and maintainedCOSTS MONEY | |
| 57% | Section 7.11 developer contributionsCOSTS MONEY |
Based on 284 approvals with a published notice of determination · 6 of the conditions above carry a cost. A condition on most approvals is effectively standard; it is not a guarantee of what any individual consent will say.
Development type mix
What people are building in Hunters Hill Council. Ranked by DA volume.
Development cost distribution
Estimated development cost ranges reported on Hunters Hill Council DAs.
Hunters Hill Council DAs — common questions
Answered from this council's own determinations. Where a council has not published a figure, the question is left out rather than guessed.
How many development applications does Hunters Hill Council handle?
Plan Advice holds 1,172 development applications for Hunters Hill Council, 371 of them lodged in the last 12 months. The figures on this page are counted from that register, not estimated.
How long does a DA take in Hunters Hill Council?
The median assessment time is 95 days for FY25-26, after a median 13 days to get the application accepted for lodgement. That is the council's own reported figure from the NSW Planning Portal league tables, so it covers every DA they determined — not a sample.
How long does the council take to determine a DA in Hunters Hill Council?
The median is 106 days from lodgement to determination across 789 applications determined in the last 5 years, and the slowest fifth take 202 days or more. The NSW median is 60 days. Counted from the NSW Planning Portal open data, so it covers every application — not a sample.
Who decides development applications in Hunters Hill Council?
21.7% of determinations were made by council staff under delegated authority. council (delegation not specified) determined 71.7%, local planning panel determined 2%, land and environment court determined 1.2%. Anything referred to a panel or the elected body is decided in a public meeting, which adds a meeting cycle.
Does Hunters Hill Council approve clause 4.6 variations?
41.3% of applications sought a variation to a development standard, and 96.5% of those were granted (327 of 339 in the last 5 years).
Can I use a CDC instead of a DA in Hunters Hill Council?
34.8% of approvals in this LGA went through as complying development (438 certificates in the last 5 years), and 20.1% of CDC applications lodged were rejected rather than accepted. A CDC only applies if the proposal meets every development standard in the Codes SEPP.
What share of DAs does Hunters Hill Council approve?
75.7% of the 703 determined applications we hold were approved and 16.5% were refused. We can read a determination for 67.6% of this council's DAs; the rest are counted as unknown rather than assumed approved.
Why are DAs refused in Hunters Hill Council?
Across 92 refused applications, the grounds cited most often are landscaping deficiency or tree removal (53 refusals), contrary to the public interest (s4.15(1)(e)) (59 refusals), streetscape / neighbourhood character incompatibility (47 refusals). These are read from the council's own notices of determination, and most refusals cite several grounds at once.
What kinds of development are most common in Hunters Hill Council?
The most frequent application types are alterations & additions (230), dual occupancy (34), residential flat building (14).
How often is a clause 4.6 variation used in Hunters Hill Council?
470 applications — 40.1% of the register — sought a clause 4.6 variation to a development standard.
Most recent development applications
Sampled from the NSW Planning Portal open-data feed.