Liverpool City Council — Development Application Data
Liverpool City Council processes a substantial volume of development applications—1,807 lodged in the past year alone from a total of 6,758 on file since 2021—but assessments here take time, with a median of 146 days from lodgement to determination. The council's development landscape is dominated by "Other" development types at 4,527 applications, followed by dual occupancy at 600 and subdivisions at 561, while cost bands are fairly evenly distributed from projects under $100,000 (2,117 DAs) through to those exceeding $5 million (390 DAs). Clause 4.6 variations to vary development standards appear in just 1.07% of applications. When the council does refuse applications, the grounds cited include insufficient information submitted by the applicant, site unsuitability under section 4.15(1)(c), and proposals deemed contrary to the public interest under section 4.15(1)(e). A Plan Advice AI-powered assessment for your Liverpool property takes seconds to run.
Determination outcomes
Real approval, refusal and withdrawal rates from finalised DAs in the Plan Advice enriched corpus.
Based on the 99.5% of DAs in our Liverpool City Council corpus with a confirmed determination. Applications still under assessment, and any whose outcome the council has not published, are excluded rather than estimated.
How long a DA takes in Liverpool City Council, and who decides it
Counted from every application Liverpool City Council determined in the last 5 years, as published in the NSW Planning Portal open data. Timelines are lodgement to determination, so they include the time spent waiting on the applicant.
An application determined under delegation is decided by the assessing officer. Anything referred to a panel or the elected body is decided in a public meeting and adds a meeting cycle to the timeline. Where the council recorded only “Council” it did not say which, so that row is left as published.
1.2% of applications in Liverpool City Council sought a clause 4.6 variation to a development standard, and 146.2% of those variations were granted (76 of 52). 12.7% of DAs lodged were withdrawn before a determination was made. On the CDC side, 10.8% of certificates lodged were rejected rather than accepted, at an average declared cost of $600,544.
Why DAs get refused in Liverpool City Council
Grounds cited across 330 refused applications, read from the council's own notices of determination. Most recent determination indexed: September 2026. Most refusals cite several grounds at once, so these overlap.
Behind each ground above sits the verbatim paragraph the assessing officer wrote, the LEP and DCP clauses it was tested against, and the address and DA number so you can pull the notice yourself. 2,006 grounds across Liverpool City Council are indexed this way.
See the grounds in fullConditions you should expect
Approval is not the finish line — every consent arrives with conditions. This is what Liverpool City Council actually imposes, measured from the consent notices it has published.
Conditions marked costs money are the ones to budget for — contributions, bonds, specialist reports and public-domain works.
| 98% | Appoint a principal certifier | |
| 88% | Stormwater / on-site detentionCOSTS MONEY | |
| 87% | Construction certificate before works start | |
| 86% | Erosion and sediment control | |
| 86% | Waste management plan | |
| 81% | Asbestos / hazardous materials handling | |
| 78% | Dilapidation survey of neighbouring propertyCOSTS MONEY | |
| 77% | Vehicular crossing, footpath and kerb worksCOSTS MONEY | |
| 75% | Sydney Water approval (Section 73)COSTS MONEY | |
| 71% | Landscaping to be implemented and maintainedCOSTS MONEY | |
| 67% | Acoustic / noise limitsCOSTS MONEY | |
| 62% | Long service levyCOSTS MONEY |
Based on 2,667 approvals with a published notice of determination · 7 of the conditions above carry a cost. A condition on most approvals is effectively standard; it is not a guarantee of what any individual consent will say.
Development type mix
What people are building in Liverpool City Council. Ranked by DA volume.
Development cost distribution
Estimated development cost ranges reported on Liverpool City Council DAs.
Liverpool City Council DAs — common questions
Answered from this council's own determinations. Where a council has not published a figure, the question is left out rather than guessed.
How many development applications does Liverpool City Council handle?
Plan Advice holds 6,885 development applications for Liverpool City Council, 1,799 of them lodged in the last 12 months. The figures on this page are counted from that register, not estimated.
How long does a DA take in Liverpool City Council?
The median assessment time is 146 days for FY25-26, after a median 19 days to get the application accepted for lodgement. That is the council's own reported figure from the NSW Planning Portal league tables, so it covers every DA they determined — not a sample.
How long does the council take to determine a DA in Liverpool City Council?
The median is 135 days from lodgement to determination across 4,148 applications determined in the last 5 years, and the slowest fifth take 305 days or more. The NSW median is 60 days. Counted from the NSW Planning Portal open data, so it covers every application — not a sample.
Who decides development applications in Liverpool City Council?
27.3% of determinations were made by council staff under delegated authority. council (delegation not specified) determined 64.7%, local planning panel determined 2.9%, regional or sydney planning panel determined 1.1%. Anything referred to a panel or the elected body is decided in a public meeting, which adds a meeting cycle.
Does Liverpool City Council approve clause 4.6 variations?
1.2% of applications sought a variation to a development standard, and 146.2% of those were granted (76 of 52 in the last 5 years).
Can I use a CDC instead of a DA in Liverpool City Council?
72.4% of approvals in this LGA went through as complying development (11,697 certificates in the last 5 years), and 10.8% of CDC applications lodged were rejected rather than accepted. A CDC only applies if the proposal meets every development standard in the Codes SEPP.
What share of DAs does Liverpool City Council approve?
90.3% of the 10,737 determined applications we hold were approved and 9.6% were refused. We can read a determination for 99.5% of this council's DAs; the rest are counted as unknown rather than assumed approved.
Why are DAs refused in Liverpool City Council?
Across 330 refused applications, the grounds cited most often are insufficient information submitted by applicant (305 refusals), contrary to the public interest (s4.15(1)(e)) (247 refusals), site not suitable for the development (s4.15(1)(c)) (181 refusals). These are read from the council's own notices of determination, and most refusals cite several grounds at once.
What kinds of development are most common in Liverpool City Council?
The most frequent application types are dual occupancy (613), subdivision (575), alterations & additions (479).
How often is a clause 4.6 variation used in Liverpool City Council?
73 applications — 1.06% of the register — sought a clause 4.6 variation to a development standard.
Most recent development applications
Sampled from the NSW Planning Portal open-data feed.