Murray River Council — Development Application Data

A live snapshot of development activity in Murray River Council — sourced from NSW Government open data and the 413,770-DA Plan Advice corpus. Refreshed automatically. Data reflects the most recent NSW Planning Portal open-data feeds, counted application by application.

DAs on file
2,374
Since 2021
Lodged last 12m
394
Median assessment
36 days
Clause 4.6 rate
2.5%
Development standard variations

How long a DA takes in Murray River Council, and who decides it

Counted from every application Murray River Council determined in the last 5 years, as published in the NSW Planning Portal open data. Timelines are lodgement to determination, so they include the time spent waiting on the applicant.

Median determination
36 days
across 1,909 determinations
Slowest 20% take
81+ days
the figure worth planning around
Against NSW
-24 days
the NSW median is 60 days
Approved as CDC
27.7%
761 complying development certificates
Who determines applications here
Council (delegation not specified)98.9% · 1,908

An application determined under delegation is decided by the assessing officer. Anything referred to a panel or the elected body is decided in a public meeting and adds a meeting cycle to the timeline. Where the council recorded only “Council” it did not say which, so that row is left as published.

2.5% of applications in Murray River Council sought a clause 4.6 variation to a development standard, and 64% of those variations were granted (32 of 50). 1.5% of DAs lodged were withdrawn before a determination was made. On the CDC side, 23.1% of certificates lodged were rejected rather than accepted, at an average declared cost of $187,896.

Development type mix

What people are building in Murray River Council. Ranked by DA volume.

Erection of a new structure996
Shed625
Dwelling house501
Dwelling312
Alterations or additions to an existing building or structure238
Residential Accommodation162
Garages, carports and car parking spaces137
Pools / decks / fencing103

Development cost distribution

Estimated development cost ranges reported on Murray River Council DAs.

Under $100k1,225
$100k – $500k611
$500k – $1M384
$1M – $5M100
$5M+40

Murray River Council DAs — common questions

Answered from this council's own determinations. Where a council has not published a figure, the question is left out rather than guessed.

How many development applications does Murray River Council handle?

Plan Advice holds 2,374 development applications for Murray River Council, 394 of them lodged in the last 12 months. The figures on this page are counted from that register, not estimated.

How long does a DA take in Murray River Council?

The median assessment time is 36 days. That is the council's own reported figure from the NSW Planning Portal league tables, so it covers every DA they determined — not a sample.

How long does the council take to determine a DA in Murray River Council?

The median is 36 days from lodgement to determination across 1,909 applications determined in the last 5 years, and the slowest fifth take 81 days or more. The NSW median is 60 days. Counted from the NSW Planning Portal open data, so it covers every application — not a sample.

Who decides development applications in Murray River Council?

0.1% of determinations were made by council staff under delegated authority. council (delegation not specified) determined 98.9%. Anything referred to a panel or the elected body is decided in a public meeting, which adds a meeting cycle.

Does Murray River Council approve clause 4.6 variations?

2.5% of applications sought a variation to a development standard, and 64% of those were granted (32 of 50 in the last 5 years).

Can I use a CDC instead of a DA in Murray River Council?

27.7% of approvals in this LGA went through as complying development (761 certificates in the last 5 years), and 23.1% of CDC applications lodged were rejected rather than accepted. A CDC only applies if the proposal meets every development standard in the Codes SEPP.

What kinds of development are most common in Murray River Council?

The most frequent application types are erection of a new structure (996), shed (625), dwelling house (501).

How often is a clause 4.6 variation used in Murray River Council?

60 applications — 2.53% of the register — sought a clause 4.6 variation to a development standard.

Most recent development applications

Sampled from the NSW Planning Portal open-data feed.

PAN-676419
1771 Perricoota Road Moama Folio 1/285882
Erection of a new structure · lodged 2026-09-17
$13,750
PAN-676363
14 BLACK SWAN BOULEVARD MOAMA 2731
Shed · lodged 2026-09-17
$38,673
PAN-676352
2 Boronia Drive, Moama NSW 2731
Shed · lodged 2026-09-17
$99,663
PAN-675951
RANGEMORE ROAD CALIMO 2710
Erection of a new structure · lodged 2026-09-17
$200,000
PAN-675941
5 GRIMISON ROAD MOAMA 2731
Alterations or additions to an existing building or structure · lodged 2026-09-17
$150,000
Assessing a property in Murray River Council?

Get a free, instant AI-powered analysis of your property's zoning, planning controls and likely DA outcome — grounded in Plan Advice's 413,770-DA NSW corpus.

Start free assessment →
Nearby councils: murrumbidgee · muswellbrook · nambucca valley · narrabri · narrandera · narromine · newcastle · north sydney · northern beaches · oberon · orange · parkes — or see DA statistics for all 129 NSW councils.