Plan Advice
← Back to Plan Advice

Edward River Council — Development Application Data

A live snapshot of development activity in Edward River Council — sourced from NSW Government open data and the 413,770-DA Plan Advice corpus. Refreshed automatically. Data reflects the most recent NSW Planning Portal open-data feeds, counted application by application.

DAs on file
644
Since 2021
Lodged last 12m
111
Median assessment
31 days
Clause 4.6 rate
1.9%
Development standard variations

How long a DA takes in Edward River Council, and who decides it

Counted from every application Edward River Council determined in the last 5 years, as published in the NSW Planning Portal open data. Timelines are lodgement to determination, so they include the time spent waiting on the applicant.

Median determination
31 days
across 522 determinations
Slowest 20% take
56+ days
the figure worth planning around
Against NSW
-29 days
the NSW median is 60 days
Approved as CDC
15.3%
98 complying development certificates
Who determines applications here
Council (delegation not specified)61.5% · 323
Council staff under delegation37.3% · 196

An application determined under delegation is decided by the assessing officer. Anything referred to a panel or the elected body is decided in a public meeting and adds a meeting cycle to the timeline. Where the council recorded only “Council” it did not say which, so that row is left as published.

2.2% of applications in Edward River Council sought a clause 4.6 variation to a development standard, and 0% of those variations were granted (0 of 12). 1.1% of DAs lodged were withdrawn before a determination was made. On the CDC side, 40.8% of certificates lodged were rejected rather than accepted, at an average declared cost of $171,221.

Development type mix

What people are building in Edward River Council. Ranked by DA volume.

Erection of a new structure211
Shed146
Dwelling house101
Alterations or additions to an existing building or structure70
Demolition60
Dwelling48
Change of use of land or a building or the classification of a building under the Building Code of Australia41
Subdivision of land28

Development cost distribution

Estimated development cost ranges reported on Edward River Council DAs.

Under $100k375
$100k – $500k139
$500k – $1M66
$1M – $5M45
$5M+11

Edward River Council DAs — common questions

Answered from this council's own determinations. Where a council has not published a figure, the question is left out rather than guessed.

How many development applications does Edward River Council handle?

Plan Advice holds 644 development applications for Edward River Council, 111 of them lodged in the last 12 months. The figures on this page are counted from that register, not estimated.

How long does a DA take in Edward River Council?

The median assessment time is 31 days. That is the council's own reported figure from the NSW Planning Portal league tables, so it covers every DA they determined — not a sample.

How long does the council take to determine a DA in Edward River Council?

The median is 31 days from lodgement to determination across 522 applications determined in the last 5 years, and the slowest fifth take 56 days or more. The NSW median is 60 days. Counted from the NSW Planning Portal open data, so it covers every application — not a sample.

Who decides development applications in Edward River Council?

37.3% of determinations were made by council staff under delegated authority. council (delegation not specified) determined 61.5%. Anything referred to a panel or the elected body is decided in a public meeting, which adds a meeting cycle.

Does Edward River Council approve clause 4.6 variations?

2.2% of applications sought a variation to a development standard, and 0% of those were granted (0 of 12 in the last 5 years).

Can I use a CDC instead of a DA in Edward River Council?

15.3% of approvals in this LGA went through as complying development (98 certificates in the last 5 years), and 40.8% of CDC applications lodged were rejected rather than accepted. A CDC only applies if the proposal meets every development standard in the Codes SEPP.

What kinds of development are most common in Edward River Council?

The most frequent application types are erection of a new structure (211), shed (146), dwelling house (101).

How often is a clause 4.6 variation used in Edward River Council?

12 applications — 1.86% of the register — sought a clause 4.6 variation to a development standard.

Most recent development applications

Sampled from the NSW Planning Portal open-data feed.

DA2026/0053
94 ARATULA NORTH ROAD DENILIQUIN 2710
Change of use of land or a building or the classification of a building under the Building Code of Australia · lodged 2026-07-14
$1,575,200
DA2026/0077
336 VICTORIA STREET DENILIQUIN 2710
Alterations or additions to an existing building or structure · lodged 2026-09-11
$280,000
DA2026/0070
266 RIVER STREET DENILIQUIN 2710
Change of use of land or a building or the classification of a building under the Building Code of Australia · lodged 2026-09-04
$6,655
DA2026/0065
321 WOOD STREET DENILIQUIN 2710
Shed · lodged 2026-08-12
$79,000
PAN-674158
771 ARATULA NORTH ROAD DENILIQUIN 2710
Dwelling house · lodged 2026-09-14
$250,000
Assessing a property in Edward River Council?

Get a free, instant AI-powered analysis of your property's zoning, planning controls and likely DA outcome — grounded in Plan Advice's 413,770-DA NSW corpus.

Start free assessment →
Nearby councils: eurobodalla · fairfield · federation · forbes · georges river · gilgandra · glen innes severn · goulburn mulwaree · greater hume · griffith · gunnedah · gwydir — or see DA statistics for all 129 NSW councils.