Edward River Council — Development Application Data

A live snapshot of development activity in Edward River Council — sourced from NSW Government open data and the Plan Advice precedent library of 129,723 council determinations. Refreshed automatically. Data reflects the most recent NSW Planning Portal open-data feeds, counted application by application.

DAs on file
659
Since 2021
Lodged last 12m
110
Median assessment
31 days
Clause 4.6 rate
1.8%
Development standard variations

How long a DA takes in Edward River Council, and who decides it

Counted from every application Edward River Council determined in the last 5 years, as published in the NSW Planning Portal open data. Timelines are lodgement to determination, so they include the time spent waiting on the applicant.

Median determination
31 days
across 518 determinations
Slowest 20% take
56+ days
the figure worth planning around
Against NSW
-29 days
the NSW median is 60 days
Approved as CDC
16.1%
102 complying development certificates
Who determines applications here
Council (delegation not specified)58.3% · 304
Council staff under delegation40.5% · 211

An application determined under delegation is decided by the assessing officer. Anything referred to a panel or the elected body is decided in a public meeting and adds a meeting cycle to the timeline. Where the council recorded only “Council” it did not say which, so that row is left as published.

2.3% of applications in Edward River Council sought a clause 4.6 variation to a development standard, and 0% of those variations were granted (0 of 12). 1.3% of DAs lodged were withdrawn before a determination was made. On the CDC side, 42.2% of certificates lodged were rejected rather than accepted, at an average declared cost of $165,732.

Development type mix

What people are building in Edward River Council. Ranked by DA volume.

Erection of a new structure224
Shed149
Dwelling house104
Alterations or additions to an existing building or structure73
Demolition62
Dwelling48
Change of use of land or a building or the classification of a building under the Building Code of Australia40
Subdivision of land28

Development cost distribution

Estimated development cost ranges reported on Edward River Council DAs.

Under $100k387
$100k – $500k139
$500k – $1M69
$1M – $5M45
$5M+11

Edward River Council DAs — common questions

Answered from this council's own determinations. Where a council has not published a figure, the question is left out rather than guessed.

How many development applications does Edward River Council handle?

Plan Advice holds 659 development applications for Edward River Council, 110 of them lodged in the last 12 months. The figures on this page are counted from that register, not estimated.

How long does a DA take in Edward River Council?

The median assessment time is 31 days. That is the council's own reported figure from the NSW Planning Portal league tables, so it covers every DA they determined — not a sample.

How long does the council take to determine a DA in Edward River Council?

The median is 31 days from lodgement to determination across 518 applications determined in the last 5 years, and the slowest fifth take 56 days or more. The NSW median is 60 days. Counted from the NSW Planning Portal open data, so it covers every application — not a sample.

Who decides development applications in Edward River Council?

40.5% of determinations were made by council staff under delegated authority. council (delegation not specified) determined 58.3%. Anything referred to a panel or the elected body is decided in a public meeting, which adds a meeting cycle.

Does Edward River Council approve clause 4.6 variations?

2.3% of applications sought a variation to a development standard, and 0% of those were granted (0 of 12 in the last 5 years).

Can I use a CDC instead of a DA in Edward River Council?

16.1% of approvals in this LGA went through as complying development (102 certificates in the last 5 years), and 42.2% of CDC applications lodged were rejected rather than accepted. A CDC only applies if the proposal meets every development standard in the Codes SEPP.

What kinds of development are most common in Edward River Council?

The most frequent application types are erection of a new structure (224), shed (149), dwelling house (104).

How often is a clause 4.6 variation used in Edward River Council?

12 applications — 1.82% of the register — sought a clause 4.6 variation to a development standard.

Most recent development applications

Sampled from the NSW Planning Portal open-data feed.

DA2026/0089
92 JUNCTION STREET DENILIQUIN 2710
Alterations or additions to an existing building or structure · lodged 2026-11-06
$27,552
DA2026/0088
5 LIEFTING COURT DENILIQUIN 2710
Dwelling house · lodged 2026-11-06
$500,000
DA2026/0087
262 HENRY STREET DENILIQUIN 2710
Shed · lodged 2026-11-06
$9,180
DA2026/0077
336 VICTORIA STREET DENILIQUIN 2710
Alterations or additions to an existing building or structure · lodged 2026-09-11
$280,000
DA2026/0086
5 MACAULEY STREET DENILIQUIN 2710
Erection of a new structure · lodged 2026-11-06
$31,900
Assessing a property in Edward River Council?

Get a free, instant AI-powered analysis of your property's zoning, planning controls and likely DA outcome — grounded in Plan Advice's 129,723-determination NSW precedent library.

Start free assessment →
Nearby councils: eurobodalla · fairfield · federation · forbes · georges river · gilgandra · glen innes severn · goulburn mulwaree · greater hume · griffith · gunnedah · gwydir — or see DA statistics for all 129 NSW councils.